Turning Over Plans
Since Engineer E had been paid for his services, which included preparing and issuing the "as built" plans, I feel it is his duty to turn them over.
As for what F should do, this is to convoluted a story for me to sort out.
There is a foul odor – Turning over Plans posted by loisf323
Turning Over Plans posted by welden
Foul air is unfair posted by Michael Loui
Foul business posted by jrochest